Old Orchard

TIMELINE
2022 – 2024

BUDGET
$330,000

LOCATION
CHILLIWACK, BC

STATUS
COMPLETE

SERVICES

Excavation

Earthworks

Landscaping

PROJECT HIGHLIGHTS

  • New Driveway
  • Protect and Armour Existing Creek Area
  • Septic System Replacement
  • Rock Wall

PROJECT DESCRIPTION

This project addressed the driveway washout issue from November 2021. It involved creating a new drive way with proper drainage by excavating into the rock hill, installing a larger culvert, and continuing the driveway with a swale for water management. Additionally, measures included building a new rock wall for wider access to the garage, installing safety barriers and landscape screens, repaving the entire driveway.

PROJECT GOAL

Our project goal was to address the existing problem by  constructing a new driveway with proper drainage, installing a larger culvert, building rock walls for stability and access, armoring the creek area to prevent further erosion, replacing the septic system, and enhancing landscaping. All while ensuring long-term functionality and compliance with relevant regulations. Collaboration with FVE was emphasized to ensure that the proposed solutions met approval and adhered to standards. 

PROJECT GOAL

Our project goal is to provide a range of customized infrastructure services to this residential development that meet the specific needs of the community. Our team will work closely with the development team and other stakeholders to ensure the highest levels of performance and safety in all our services.

For example, our storm works services will involve the installation of a network of stormwater drainage systems that are specifically designed to mitigate potential flooding in the development. Our sanitary services will be customized to the specific waste management needs of the development while promoting public health by implementing best practices in waste reduction and management. Our water works services will focus on delivering a reliable and efficient supply of clean and safe water to homes, while minimizing water loss and maximizing water conservation. Additionally, our road works services will incorporate traffic calming measures, pedestrian walkways, and cycling lanes to enhance safety and convenience. Our landscaping services will create an attractive living environment by using native vegetation and taking into consideration the specific terrain and natural features of the development. Finally, our hydro & tel services will be designed to meet the unique power and communication needs of the development, using state-of-the-art technologies to deliver reliable and efficient services.