TIMELINE
2022 – 2024
BUDGET
$330,000
CHILLIWACK, BC
STATUS
COMPLETE
SERVICES
Excavation
Earthworks
Landscaping
PROJECT HIGHLIGHTS
- New Driveway
- Protect and Armour Existing Creek Area
- Septic System Replacement
- Rock Wall
PROJECT DESCRIPTION
This project addressed the driveway washout issue from November 2021. It involved creating a new drive way with proper drainage by excavating into the rock hill, installing a larger culvert, and continuing the driveway with a swale for water management. Additionally, measures included building a new rock wall for wider access to the garage, installing safety barriers and landscape screens, repaving the entire driveway.
PROJECT GOAL
Our project goal was to address the existing problem by constructing a new driveway with proper drainage, installing a larger culvert, building rock walls for stability and access, armoring the creek area to prevent further erosion, replacing the septic system, and enhancing landscaping. All while ensuring long-term functionality and compliance with relevant regulations. Collaboration with FVE was emphasized to ensure that the proposed solutions met approval and adhered to standards.
PROJECT GOAL
For example, our storm works services will involve the installation of a network of stormwater drainage systems that are specifically designed to mitigate potential flooding in the development. Our sanitary services will be customized to the specific waste management needs of the development while promoting public health by implementing best practices in waste reduction and management. Our water works services will focus on delivering a reliable and efficient supply of clean and safe water to homes, while minimizing water loss and maximizing water conservation. Additionally, our road works services will incorporate traffic calming measures, pedestrian walkways, and cycling lanes to enhance safety and convenience. Our landscaping services will create an attractive living environment by using native vegetation and taking into consideration the specific terrain and natural features of the development. Finally, our hydro & tel services will be designed to meet the unique power and communication needs of the development, using state-of-the-art technologies to deliver reliable and efficient services.